Transformation at Gowon Baracks
Challenge
Installation of 3x300KVA, 33/0.415KV Transformer Substation, 3.41Km of 33KV Overhead Line at Gowon Barracks, Abuja.
Installation of 3x300KVA, 33/0.415KV Transformer Substation, 3.41Km of 33KV Overhead Line at Gowon Barracks, Abuja.